A Customer Has Set an EDI Deadline. What Do You Need Ready?
A practical EDI onboarding checklist for suppliers: customer specifications, order and invoice data, testing, exceptions and the cutover to live trading.
A large customer wants electronic orders and invoices by a fixed date. Your team still works through email, spreadsheets and the accounts package. The deadline is now a commercial problem as well as a technical one.
The first job is to find out exactly what the customer will accept and what your operation must do to produce it. Buying a connector before answering those questions can leave the hardest work untouched.
At Everything Boxed, we delivered the order and invoice flow required to keep its biggest customer. At Miranda, the work included budget checks, order matching and invoice approval. These are different processes, even though both involve electronic documents. The checklist below is a starting point for scoping your own project.
1. Get the customer's actual specification
Ask for the onboarding pack, document specifications, example files, connection details and the name of the person who signs off testing. Confirm which messages are required for the first release: purchase orders, invoices, acknowledgements or other documents.
Record the deadline, the customer's test windows and any dependency on a trading network or another supplier. A format name alone is not a specification. Our TRADACOMS invoicing work had to meet the receiving merchant's particular requirements as well as generate the right file structure.
2. Trace each field back to a source
Take a real order and invoice through the process. Where do product codes, quantities, prices, delivery addresses, tax values and purchase-order references come from? Which system owns each value? Who corrects it when the customer's reference does not match yours?
Write down the mappings and missing data. Include units and rounding rules where they matter. A file can be structurally valid and still contain a price or reference the customer will reject.
A worked example: one order from purchase order to acceptance
The two companies below are invented. Fenwick Packaging is a fictional supplier and Northgate Home Supply a fictional buyer. The codes, prices and messages are synthetic and show the steps to agree; they are not a Revitt client result. Our real delivery work is in the Everything Boxed and TRADACOMS invoicing case studies.
Northgate's onboarding pack defines two documents: a purchase order and an invoice, which it calls NG-ORD-01 and NG-INV-02. These are Northgate's own logical layouts, listing the fields and rules to agree; this example is not wire syntax, and nothing below is sent in this form. A real TRADACOMS or EDIFACT message carries the same facts inside the standard's own segments, codes and control totals.
The purchase order
Northgate sends order 4471206 on 2 November 2026, for delivery to its Leeds distribution centre.
| Buyer code | Item | Qty | Line net |
|---|---|---|---|
| PACK-C4-WHT | White mailer box, 240 mm | 25 | £21.00 |
| TAPE-48-CLR | Clear tape, 48 mm × 66 m | 10 | £16.50 |
| LBL-100-THM | Thermal labels, 100 × 150 mm | 4 | £49.60 |
Order net £87.10, VAT at 20% £17.42, gross £104.52. Unit prices are £0.84, £1.65 and £12.40 from the contract price list for this buyer.
Mapping each field to a source
| Buyer field | Where Fenwick holds it | Rule agreed with Northgate |
|---|---|---|
| Order reference | Fenwick sales order SO-8871 | Send 4471206; SO-8871 stays internal |
| Product code | Fenwick catalogue, mapped | Unmapped codes hold the order |
| Quantity | Warehouse despatch scan | Match the despatch advice |
| Unit price | Contract price list, ex VAT | Two decimals, taken from the price list |
| Line net | Quantity × unit price | Rounded per line; sums to the invoice net |
| VAT | 20% per line, added after rounding | Net plus VAT equals gross |
| Invoice number | Fenwick invoice register | Unique; quoted in the acknowledgement |
Where Northgate offers a supplier EDI API integration instead of a trading network, the transport changes but these rules do not: the same fields, codes, totals and acknowledgements still have to line up.
The invoice, and the first rejection
Fenwick despatches 24 of the 25 mailer boxes; one carton is damaged and never leaves the warehouse. The invoice is built from the sales order, so it copies the ordered quantity instead of the despatched quantity and asks for £104.52.
Northgate matches the order, the despatch advice and the invoice before paying. It rejects the first NG-INV-02 message, invoice INV-2026-0417, with the code QTY_MISMATCH, quoting the invoice number and the counts that disagreed: 25 invoiced, 24 received.
| First attempt | Corrected | |
|---|---|---|
| Boxes invoiced | 25 | 24 |
| Invoice net | £87.10 | £86.26 |
| VAT at 20% | £17.42 | £17.25 |
| Invoice gross | £104.52 | £103.51 |
| Northgate's response | Rejected | Accepted |
The corrected invoice uses the despatched quantity, so the mailer box line is 24 × £0.84 = £20.16. The unit that was never despatched is not invoiced at all, so the correction changes a quantity rather than reversing a charge. Whether the buyer wants a corrected invoice, a credit note or a reissued document is settled by the two companies' accounting rules and Northgate's pack rather than the EDI format.
Retries, duplicates and acknowledgements
Northgate's pack asks for the corrected document under a new invoice number, so it goes out as INV-2026-0418, quoting the rejected INV-2026-0417 in its reference field. That is Northgate's own rule rather than a rule of EDI: Northgate's duplicate check keys on the invoice number, so reusing a rejected one would let it treat the correction as the old document coming back. Another buyer may ask for a corrected copy under the same number, so agree the rule with the buyer before testing.
The first transmission of INV-2026-0418 times out before Northgate's acknowledgement arrives, so Fenwick's queue retries it. Both copies reach Northgate. The second is identified as a duplicate of a document already held, acknowledged, and processed once: there is no second invoice and no second payment instruction. Fenwick's system records one accepted document and stops retrying.
| Queue state | What it means | What happens next |
|---|---|---|
| Prepared | Built, waiting | Nothing leaves until checks pass |
| Awaiting acknowledgement | Network took it; buyer silent | Retry the same number in the agreed window |
| Accepted | Buyer processed it | Close it and stop retrying |
| Rejected | Refused with a code | Fix the data, then follow the buyer's agreed rule for the number |
| Duplicate | Buyer already holds it | No second processing |
Northgate's pack should also say which of these EDI tasks belong to the buyer and which to the supplier: who answers an acknowledgement, who corrects a rejected line, and how quickly either side must respond. A connection where nobody owns the rejected row is the one that quietly loses invoices.
What acceptance looks like
Northgate's tester accepts INV-2026-0418 inside the agreed test window. The acceptance sheet records the order, both invoice attempts, the rejection code, the corrected totals and the duplicate copy, with the names of the people on each side who signed it off. Live trading then starts on the same checks: every document is validated before sending, and the first live invoice is matched to its order before anyone relies on the payment date.
3. Agree the approvals and exceptions
Decide which documents can move automatically and which need a person to review them. That may include an unknown product, a price difference, an exceeded budget or an invoice that does not match the order.
Give each exception an owner and a visible queue. The operations team needs to know what happened, what is waiting and what to do next. A technical error buried in a log does not help someone answer a customer's call.
At Miranda, daily invoice preparation was automated while the operations team kept approval before sending. Automation did not remove that decision from the business.
4. Test the whole transaction, including failure
Agree acceptance tests with the customer and your operations team. Use representative documents and check the resulting records in both systems. Include:
- An ordinary order and its matching invoice.
- Missing or incorrect references and rejected documents.
- A repeated document, so a retry does not create another order or invoice.
- A dropped connection and the return to normal service.
- Corrections and any credit-note flow included in the scope.
If no test or staging environment is available, build a mock of the customer's interface from their specification and sample documents. Use it to test valid messages, rejections, retries and connection failures without sending live orders or invoices. Record the assumptions in the mock and agree a final check against the real system with the customer before switching over.
Keep a record of the tests and who accepted them. Successful transmission is only one part of success; confirm that the receiving system accepted and processed the document as expected.
5. Plan the switch to live trading
Agree when the old process stops, which open orders remain in it and how the team will reconcile documents during the change. Assign someone to check the first live transactions with the customer.
Write down the fallback if a critical check fails. A manual route is useful only if the customer accepts it and both sides know how to avoid duplicates when automated processing resumes.
6. Decide who owns it afterwards
Name the people responsible for failed documents, connection problems, specification changes and software updates. Agree access, monitoring and support hours. The build contract and ongoing support agreement should make those responsibilities clear.
You do not need every future report before the deadline. You do need a reliable route through the required transaction, with checks and people able to handle the exceptions.
If you have the customer's specification and a date, our EDI integration service is a place to start. Where the surrounding process also needs changing, digital ordering and procurement covers the checks, approvals and operational workflow. Send us the requirement and we will scope the first release.