---
title: "AI Agent Efficiency Review"
url: "/services/ai-agent-efficiency-review"
canonical_url: "https://revitt.co/services/ai-agent-efficiency-review"
summary: "Where does the time and money go, and which changes are worth making?"
---

# AI Agent Efficiency Review

> Where does the time and money go, and which changes are worth making?

If agents answer order enquiries, check product details or handle other regular work, could you follow one job from start to finish? How much did the models use, how long did people wait, and did someone have to put the result right?

We take a fixed-fee look at an agreed set of jobs. We trace the cost and time, check whether the models suit the work, and try two or three changes on the same cases. You get the evidence and a written recommendation you can use with your own team or supplier.

We run Revitt with AI agents and built our own tools to see what each run uses and keep spending within limits. We try models on representative jobs and review the work they produce alongside the cost.

## What it does for your business

- **Can you follow the bill to the work?**: See which agents and steps use the most, what can be matched to the bill, and what a correctly finished job costs once retries and staff checks are counted.
- **Does the model suit the job?**: See how the current setup manages routine work and harder cases. If we try a simpler or more capable model, we judge it against the same standard.
- **What is worth doing next?**: See what changed in the trials, what it might take to put a change into use, and where you’d need more evidence first.

## Who does this suit?

- **Do agents already handle regular work?**: You can name the job, such as answering order questions or checking product details, and say who judges the result.
- **Do you have a decision coming up?**: You want to understand a bill, a queue or the effect of increasing the amount of work the agents handle.
- **Can you show how the work runs?**: Someone on your team or at your supplier can help us follow the jobs and see where people step in.
- **Scope**: What does the agreed fee cover? Measurement, controlled trials and the findings. Any changes you want put into live use are scoped and quoted separately.
- **Not the answer**: Still deciding where to use AI, or looking to set up coding agents and train your developers?

## What happens after you get in touch?

01. **Tell us about one job**: On a free call with Max, tell us what the agent does, how often it does it and what you’d like to find out.
02. **Show us what you can measure**: We’ll ask what records you have for usage, bills and finished work. If the basics need measuring first, we’ll explain what is missing.
03. **Agree the work**: We’ll set out the jobs and checks in scope, how the trials can run, and the fixed fee in writing.

## What we deliver

- **Written findings**: What the agents used, what the work cost where we could trace it, and how well the jobs were done.
- **Changes in order of priority**: What we’d try first, what we expect it to affect and what could go wrong.
- **Before-and-after findings**: Two or three changes tested against the current setup, including any change in time, cost, mistakes or staff work.
- **A record of the open questions**: What the figures could tell us, what still needs checking and the decision you can make now.

## Process

01. **Agree what counts as a good result**: We ask the people who know the work which results they would accept and which they would send back.
02. **Follow the jobs as they run today**: We trace the work, including what the agents read, what they return, and where they wait, try again or need a person.
03. **Try the changes on the same work**: We use agreed test cases and check the results against the same standard. Trials are controlled so they can’t, for example, send a second reply to a customer.
04. **Go through the findings with you**: We show you what we would change, what we’d leave alone and what needs another check.

## FAQs

**Can you help if we only have a total bill?**

We can start by checking what can be tied back to individual jobs. If the records don’t let us do that, we’ll tell you what to measure first. We can quote that work separately.

**How long does it take?**

Allow about two working weeks for a standard review once the records and people are available. We’ll agree the timetable before we start.

**What if we pay a fixed subscription?**

We look at what your agents use and how much of the plan it takes. If a change frees up capacity, we’ll explain what that could mean for the way you use the plan and whether the bill would change.

**Do we have to share customer logs?**

Your logs stay on your systems. We’ll agree what we need to see and how the tests can run. Nothing from the review is sent to a provider that trains on it.

**Will the review cut our bill?**

That depends on what the trials show and how you’re billed. We’ll show you any measured difference in cost and time alongside mistakes and extra checking. If a change makes the work worse, we’ll say so.

**Who makes the changes afterwards?**

You decide what to do with the findings. Your own team or supplier can use them. If you want Revitt to make a change, we’ll scope and quote that work separately.

## Next step

- [Book a call](https://revitt.co/book.md)
- [Send a brief](https://revitt.co/contact.md)
